Fire Army April 15

 

– Sarah and yousseff soldered wires to our motors

– Khaleel worked on designing a stand for our vacuum to fit on top of the mobile platform

– We problem solved on how to create a code for stepper motors as opposed to the servo test code we had

– we’re still waiting to get a second Xbee chip and breakout boards

 

image (2) image (3)

Advertisements

Leave a Reply

Please log in using one of these methods to post your comment:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s