Shapeshifting Dragons Last Prototyping Day

-First we had to align the wooden brace to the mount by measuring it to the precise point so we could screw in the bases together later on

– Navisha and Kelvin screwed in the nails to the sides of the mount

– The group is making the measurements to plot the location of the 3 nails that are going to be drilled in through the ends of the bases

New Materials: From Trip to Home Depot

– 6×2 Nails

Next week, Winston plans to come in with a few sets of 3D printed U-Hooks that will serve as the wheel’s “flat surface”.

We also agree to meet up more frequently since there is still much drilling and work still to be done.

Note: the wheel’s diameter is .81 inches.

 

Advertisements

Leave a Reply

Please log in using one of these methods to post your comment:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s